Railway Study in connection with construction of New Broad Gauge line between Chotta Udaipur – Dhar of 157 kms
Consulted with stakeholders to inform traffic study and environmental and social concerns
Conducted route identification and selection of ‘optimum’ alignment
Design of plan and Profile (L -Section)
Field investigations including hydrological, geological, topographic and geotechnical surveys
Prepared preliminary designs for the permanent way, bridges, culverts, stations and workshops
Prepared the bill of quantities
Estimated and forecasted land use parameters such as population, employment, agricultural, mining, industries etc.
Assessed land requirements for the project and recommended the mode of acquisition
Prepared drawings of L-Section, plan and General Arrangement Drawings (GADs) of bridges, signaling and telecommunication, train management system, and rail operations
Developed the station building plan and designs for different classes of stations