Railway Consultancy Works for Greenfield PFT at New Dadri (Uttar Pradesh) for Adani Ports & Special Economic Zones Limited
- Field Investigations
- Detailed Topographical Survey
- Land Details Assessment
- Traffic Census Survey
- Hydrological Survey
- Geotechnical Survey
Two Dedicated Freight Corridors are presently under construction namely Eastern Corridor (EDFC) from Sahnewal to Son Nagar, and Western Corridor (WDFC) from Dadri to Jawaharlal Nehru Port Terminals (Mumbai) with route Kms of more than 2800 kms and likely to be fully commissioned by 2022-23. Eastern Corridor is planned to be further extended up to Dankuni (540 kms) and the construction of the same will be undertaken through PPP mode.
Dankuni -Sonnagar-Ludhiana section of the DFC is identified as the Eastern Corridor with a total length of 1839 km, while the section from Jawaharlal Nehru Port Trust (JNPT) to Dadri via Vadodara- Ahmadabad – Palanpur-Phulera – Rewari is identified as the Western Corridor having total length of 1483 km.
Key Objectives of the Project:
Service/Sub-Service Tag
- Detailed Engineering
- Engineering
- Financial & Economical Assessments
- Infrastructure Studies, Advisory, Design
- Traffic Assessments