Feasibility Study and Detailed Project Report for Linking of Mandakini ‘B’ Coal Block with the Indian Railway Network or MGR of Talcher Kaniha STPP of NTPC Ltd
Prepared a detailed survey report based on a Final Location Survey of the selected and approved rail corridor
Developed a consolidated traffic study for coal and non-coal movement along the proposed line
Examined the feasibility of alternative alignments along with cost estimates through field reconnaissance surveys and topographic sheets of the mine
Identified a suitable location for a junction station on the mainline for rail connectivity with the Mandakini-B mine
Liaised with concerned Railway Authorities in order to prepare a plan for the communication systems, overhead track equipment, etc.
Prepared a scale plan and L-Sections of the proposed line
Prepared a land acquisition plan including schedules and cadastral map
Prepared General Arrangement Drawings for bridges and culverts
Prepared and finalized Detailed Project Report for approval from Indian Railways and NTPC