Engineering Consultancy for Railway Siding of proposed Internal Container Depot at Viramgam in Western Railway for Gateway Rail Freight Limited
Carried out total Station and station survey
Conducted CBR tests on disturbed soils
Prepared Engineering Scale Plan
Prepared detailed Bill of Quantities, cost estimates and specifications for tender documents
Prepared the Signal Inter Locking Plan
Obtained approval from concerned authority for weigh bridge installation, track construction and land licensing
Established detailed construction /erection methodology, execution plan and work schedule with construction contractors
Reviewed and approved work method and procedure
Finalized the construction code, standards and specifications etc and approved drawings
Construction Monitoring:
Reviewed contractors’ construction schedule and held review meetings to monitor the trend in schedule and progress
Reviewed site mobilization plan and monitored mobilization of required personnel, resources and equipment
Prepared monthly progress reports/exception reports highlighting the percentage completion of work and areas of concern with respect to schedule to be deployed.
Reviewed the Contractor’s construction and quality assurance plan and confirmed its compliance
Finalized the inspection and test plan
Audited and approved welding procedures and welder’s qualification procedure
Arranged and advised on track testing and trial runs
Organized inspection of completed works
Monitored safety procedures
Construction Inspection:
Audited documentation submitted by the construction contractors periodically
Provided oversight regarding the necessary arrangements for required field inspection and tests
Vetted As-Built Drawings submitted by contractors
Provided certification of measurements/milestone progress of site work