Study for carrying out fly ash transportation from ash pond through rail mode connecting the same to existing railway siding/rail routes at all coal fired thermal power stations of MPPGCL
Site condition assessment of all four plants
Field survey of the existing rail route from silos to railway line
Study of the water consumption, energy consumption, environmental, and pollution control norms to ensure compliance
Identified the source of water/wastewater for meeting the excess water requirement for misting / sprinkling in co- ordination with concerned plant officials
Prepared detailed diagrams including Layout Plan, Water Balance Diagram, etc. as necessary
prepared plant-wise technical specifications
Preparation of tender documents including Instructions to the Bidders, Pre-Qualification Requirement, Tender Evaluation criteria, Annexure & Schedules, Price Bid Template etc.