Consultancy for approval of DPR & ESP from Western Railway for Greenfield PFT at Tumb (taking off from Sanjan Station of Western Railway)
Prepared L-Section, cross section of alignment, land licensing drawings, design of retaining wall with structural design
Prepared general arrangement drawings (GADs)
Prepared Engineering Scale Plan (ESP)
Prepared the Bill of Quantities and detailed cost estimates for project
Prepared technical specifications and tender documents
Conducted hydraulic assessment
Investigated and advised on track selection that was suitable for the embankment and bridge design
Established detailed construction /erection methodology, execution plan and work schedule with construction contractors
Reviewed and approved work method and procedure
Finalized the construction code, standards and specifications etc and approved drawings
Construction Monitoring:
Reviewed contractors’ construction schedule and held review meetings to monitor the trend in schedule and progress
Reviewed site mobilization plan and monitored mobilization of required personnel, resources and equipment
Prepared monthly progress reports/exception reports highlighting the percentage completion of work and areas of concern with respect to schedule to be deployed.
Reviewed the Contractor’s construction and quality assurance plan and confirmed its compliance
Finalized the inspection and test plan
Audited and approved welding procedures and welder’s qualification procedure
Arranged and advised on track testing and trial runs
Organized inspection of completed works
Monitored safety procedures
Construction Inspection:
Audited documentation submitted by the construction contractors periodically
Provided oversight regarding the necessary arrangements for required field inspection and tests
Vetted As-Built Drawings submitted by contractors
Provided certification of measurements/milestone progress of site work