In the light of previous assessment to determine the capacity of the Cameroon railway network to handle increased bauxite traffic from IRF to the port, the following describes the phasing and scope required for the study. The minimum target capacity is 6.5Mtpa, with the potential to reach 10Mtpa
Scope of Services include :
1. Network Assessment
2. Transportation Capacity Optimization
3.Recommend Way Forward
4. Project Development
5.Detailed Design