Railway Consultancy Works for Greenfield PFT at New Bhimsen (Uttar Pradesh) for Adani Ports & Special Economic Zones Limited

    Two Dedicated Freight Corridors are presently under construction namely Eastern Corridor (EDFC) from Sahnewal to Son Nagar, and Western Corridor (WDFC) from Bhimsen to Jawaharlal Nehru Port Terminals (Mumbai) with route Kms of more than 2800 kms and likely to be fully commissioned by 2022-23. Eastern Corridor is planned to be further extended up to Dankuni (540 kms) and the construction of the same will be undertaken through PPP mode.

    Key Objectives of the Project:

    • Field Investigations
    • Detailed Topographical Survey
    • Land Details Assessment
    • Traffic Census Survey
    • Hydrological Survey
    • Geotechnical Survey

     

Service/Sub-Service Tag

  • Detailed Engineering
  • Engineering
  • Financial & Economical Assessments
  • Infrastructure Studies, Advisory, Design
  • Traffic Assessments