Detailed Engineering Consultancy for Private Siding at Osara (Madhya Pradesh), taking off from Jhalawar Road station in Kota division of West Central Railway for Ambuja Cements Limited
Carry out Reconnaissance survey
Assess the extent of land required in coordination with revenue officials and earmark the alignment on the cadastral map of the revenue department
Prepare Conceptual design of Private railway line with the loading & unloading arrangements and its various components
Define system of train working for the loading and unloading of different commodities
Assess the shunting locomotives or other arrangements
Study the facilities required in the plant yard viz. No. of reception and dispatch lines, loading & unloading lines, shunting necks, sick wagon line, mechanized loading/unloading system, weigh bridge as well as handling arrangements for other commodities
Interfacing of Stacking and storage arrangements of plant with Railway new line.
Study the requirements of service buildings like cabins, crew rest room, etc.
Electrification of new railway line, General lighting arrangement
Prepare budgetary cost for the proposed facilities covering all components of the system viz. Civil, Singalling & telecommunication (S & T) and shunting locomotives
Assist in preparing application for obtaining Rail Transport Clearance (RTC) from Railway Board
Preparation & Submission of Draft Project Report with concept plan , Draft Feasibility Report to ACL, Final Feasibility Report to Railway
Carry out Final Location Survey
Carry out detailed engineering, design & drawings of all railway components, such as takeoff points, railway line position , electrification, S & T nd other structures
Complete the entire field engineering and prepare all necessary General Arrangement working drawings
Survey of water courses and computation of flood discharge
Designing of bridges (Civil design with BOQ)
Obtain approval of design of Foot Over Bridge, Tunnel, Flyover or any Cross over bridges or structures
Obtaining the approval of design and drawing of any cross over conveyor system,t transmission lines, etc.
Preparation of time schedule for the execution of the project in the form of bar-chart and CPM/PERT chart.
Preparation of Engineering Scale Plan (ESP) and Sections for the project
Detailed plans for bridges. Plan for junction arrangements
Signaling plans, as well as Overhead Electrification (OHE) designs/plans
Detailed drawing of drainage along railway line and its connection to main storm water drain
Identify the Land Corridor
Design Signaling system
Prepare BOQ and budgetary estimate
Preparation & Submission of Detailed Project Report (DPR)
Preparation of Tender Document
Provide Supervision services for construction of new railway line