Consultancy for connectivity of proposed Rail Infrastructure of Nargol Port Pvt Ltd in Gujarat to Dedicated Freight Corridor
Reviewed the rail alignment corridor/junction/yard layout etc. identified in the pre-feasibility report
Prepared requirements for flyovers/ road over bridges, road under bridges and level crossings and interchanges.
Carried out hydraulic and hydrological studies
Prepared cross sections showing railway /road configuration based on the projected traffic with clear provisions of future expansion
Prepared designs for the rail alignment (horizontal & vertical)
Defined the system of train operations within the overall system and facilities
Prepared the Engineering Scale Plan showing the take off point, alignment and in-plant yard
Estimated the number of shunting locomotives
Prepared drawings for Overhead Equipment arrangements, signaling and telecommunication arrangements, takeoff arrangements, lead line and in –plant yard
Prepared designs for flexible and rigid pavement, junction design, drainage design, structures design
Prepared the land acquisition plan
Prepared cost estimates covering road and rail components